Key takeaways
- Gas lines and masonry structures typically need permits.
- Simple portable pits may not, but local burn rules apply.
- HOAs often require design approval.
- Check with your city first, or let us do it.
It depends on the feature
Rules differ between cities and counties, and between a portable pit and a built-in feature. In general, anything with a gas line, a permanent masonry structure or a chimney draws the most scrutiny.
Gas and masonry
New gas lines commonly require permits and inspection to protect you. Permanent masonry fireplaces may need building permits and drawings.
Open burning rules
Cities set rules for open burning, sometimes with burn bans, time limits or size limits. These apply to wood fires even if no permit is needed to build the pit.
HOAs and historic districts
Many HOAs review fire features for size, location and appearance. Historic districts may have additional rules. We can prepare the drawings and samples they ask for.
How to start
Call your city's building department or let us handle it. We check requirements before we design, so the plan you approve is a plan that can be built.
Related services
Quick answers
Who pulls the permit, me or the contractor?
Usually the contractor, but rules differ. We explain who is responsible in your estimate.
What happens if I build without a permit?
You can face fines, forced changes or trouble with insurance and resale. It is not worth the risk.
Ready to talk it through? Get a free estimate or call 615-357-7797.

